List of measures for the subsidy scheme for making homes in the municipality of Aalten more sustainable 2023
List of measures
- Facade insulation: Rd value ≥ 3.5 m² K/W
- Cavity wall insulation: Rd value ≥ 1.1 m² K/W
- Roof insulation: Rd value ≥ 3.5 m² K/W
- Attic/loft floor insulation: Rd value ≥ 3.5 m² K/W
- Floor insulation: Rd value ≥ 3.5 m² K/W
- Floor insulation: Rd value ≥ 3.5 m² K/W
- Insulating glass
- Secondary glazing or monument glass (only for monuments)
- HR++ glass
- U-value of glass ≤ 1.2 W/m2K
- Panels in window frames (U-value ≤ 1.2 W/m2K) (in combination with insulating glass)
- Insulated door (U-value ≤ 1.5 W/m2K) (in combination with insulated glass)
- Insulated window frame (U-value ≤ 2.4 W/m2K) (in combination with insulated glass)
- Triple glazing
- U-value of glass ≤ 0.7 W/m2K
- Panels in window frames (U-value ≤ 0.7 W/m2K) (in combination with insulating glass)
- Insulating door (U-value ≤ 1.0 W/m2K) (in combination with insulating glass)
- Insulated window frame (U-value ≤ 1.5 W/m2K) (in combination with insulated glass)
- Heat pump (possibly hybrid)
- Main supply for hot tap water and/or space heating
- No air conditioning system
- Solar collectors / solar water heater
- Solar panels (PV cells / PV film)
- Low temperature emission system (LTV) a. Maximum supply temperature 45–55 °C
- Heat recovery system (HRV)
- Ventilation heat recovery system with at least 90% efficiency
- Shower heat recovery unit
- Customized advice on energy savings (in combination with another measure)
The measures facade insulation, roof insulation, attic/loft floor insulation, and floor insulation are eligible under
Article 13 (DIY work) and can be carried out by the owner-occupant themselves
.
The other measures can only be carried out by a company.
If locally sprayed PIR or PUR is chosen as the insulation material for cavity wall insulation, roof insulation, floor insulation, or ground insulation, it must be applied with an HFC-free blowing agent.